YOKJI OWF - Cable Laying and Burial Method Statement

K-Bets

Project description:
This project aims to establish a sustainable and efficient energy infrastructure based on offshore wind power. For a general overview of the Yokji Offshore Windfarm Project. Aim to provide a high-level assessment and procedure documents.

OI’s scope of work:

Subsea Cable Installation

  • Choose vessel based on depth & draft.
  • Mark cable every 100m; track installation length.
  • Ensure tension & bend radius meet specs.
  • Avoid damage to structures during laying.

Subsea Cable Burial

  • Survey environment (currents, seabed, sediment).
  • Verify spare parts & equipment readiness.
  • Pre-Survey: check locations & obstacles.
  • Burial operations & depth measurement plan.
  • Post-Survey: confirm burial depth.
Share this page

Related projects

 
Strohm

Pathway Extension Loads Analysis (2024)

See project
 
H2Offshore

3D modeling of barge and steelworks for Greater Changhua OWF

See project
 
Gasunie

LNG Terminal Eemshaven (2022) Vent Fatigue Assessment

See project
Back to top