YOKJI OWF - Cable Laying and Burial Method Statement

K-Bets

Project description:
This project aims to establish a sustainable and efficient energy infrastructure based on offshore wind power. For a general overview of the Yokji Offshore Windfarm Project. Aim to provide a high-level assessment and procedure documents.

OI’s scope of work:

Subsea Cable Installation

  • Choose vessel based on depth & draft.
  • Mark cable every 100m; track installation length.
  • Ensure tension & bend radius meet specs.
  • Avoid damage to structures during laying.

Subsea Cable Burial

  • Survey environment (currents, seabed, sediment).
  • Verify spare parts & equipment readiness.
  • Pre-Survey: check locations & obstacles.
  • Burial operations & depth measurement plan.
  • Post-Survey: confirm burial depth.
Share this page

Related projects

 
Offshore Independents

Internal Project (2022) Floating Wind Installation Analysis

See project
 
Heerema Marine Contractors

Liwan & Ichthys Expert Engineering Support

See project
 
Bluestream

ROV procedures

See project
Back to top