Project description:
LS Marine Solution (LSMS) will develop the cable scope for the 99MW Jeonnam Offshore Wind Farm 1, located at approximately 8km away from the shore of island, Jaeun-do, Shinan-country.
The water depth varies from 0 to 29m above Mean Sea Level and the governing wind direction is from the Northeast.
LSMS has been awarded the power cable installation of JN1, and has contracted Tramontana Engineering/OI to perform part of the engineering.