Jeonnam Offshore Wind Farm

HESI

Project description:
Jeonnam Offshore Wind Farm is developed by JOWP (CIP and SK E&P), the first Korean large-scale commercial offshore wind project consists of 10WTG locations with an output power of 99 MW. JN1 is at approximately 8 km away from shore. HESI is the Tier 1 contractor for FOU supply and T&I for the project.

  • OI’s scope of work:
    OI has provided a Lead Engineer based in South Korea, who has supported the project with following activities:
  • Advise on installation procedures, installation equipment, engineering scopes & methods
  • Advise on contractual discussions with JOWP
  • Provide technical expertise on ground risks and mitigation solutions
  • Manage subcontractors
Share this page

Related projects

 
Boskalis

Viking Bravo Project Engineering

See project
 
RTA Offshore

Nexans Marjan Cable Load Out Analysis

See project
 
R2G

Structural Analysis Pump Foundation

See project
Back to top