Jeonnam Offshore Wind Farm

HESI

Project description:
Jeonnam Offshore Wind Farm is developed by JOWP (CIP and SK E&P), the first Korean large-scale commercial offshore wind project consists of 10WTG locations with an output power of 99 MW. JN1 is at approximately 8 km away from shore. HESI is the Tier 1 contractor for FOU supply and T&I for the project.

  • OI’s scope of work:
    OI has provided a Lead Engineer based in South Korea, who has supported the project with following activities:
  • Advise on installation procedures, installation equipment, engineering scopes & methods
  • Advise on contractual discussions with JOWP
  • Provide technical expertise on ground risks and mitigation solutions
  • Manage subcontractors
Share this page

Related projects

 
IX Renewables

Taiwan HDD Installation Analysis

See project
 
Boskalis

Business Plan for New Product Line (LNG Market)

See project
 
Van Oord

Guyana (2023) Heads Design

See project
Back to top