Above Water Tie-Ins (AWTI) Static Analysis

IRM systems

Project description:

Our client is investigating the possibility of Above Water Tie-Ins (AWTI) as a method to prepare for repair work on existing buried pipelines in shallow water.

OI’s scope of work:

  • Perform AWTI static analysis with Orcaflex for given project input
  • Perform buckling analysis according to DNVGL-ST-F101
  • Perform sensitivity analysis for different barge and davit layouts
Share this page

Related projects

 
SPT Offshore

Suction Piles for Various Projects

See project
 
Boskalis

Business Plan for New Product Line (LNG Market)

See project
 
Strohm

Pathway Extension Loads Analysis (2024)

See project
Back to top