Gwynt Y Môr - Cable Repair Analysis Support

N-Sea

Project description:
Four export circuits connect the Gwynt-Y-Môr offshore wind farm to the onshore National Grid connection system. The owner of the assets (“the OFTO”) has identified a power core fault in a section of one of the subsea power cables. This fault has resulted in reduced availability of the OFTO assets to 75%. The contractor N-sea has been awarded to perform the required repair.

OI’s scope of work:
Support N-sea by performing the required analyses for the cable repair scope of work using Orcaflex. This includes the following analyses:

  • Landfall pull-in analysis
  • Cable recovery analysis (prepared by OSV)
  • Cable jointing analysis
  • Omega joint overboarding analysis
Share this page

Related projects

 
Boskalis

Revolution Wind

See project
 
Offshore Independents

Internal Project (2022) Behaviour of suction bucket caissons during transportation

See project
 
Gasunie

LNG Terminal Eemshaven (2022) Vent Fatigue Assessment

See project
Back to top