Project description:

The Virginia Electric and Power Company, doing business as Dominion Energy, is developing the Coastal Virginia Offshore Wind – Commercial Project (CVOW-C), an offshore wind energy project rated at approximately 2,640 MW located some 43 – 67 km off the coast of Virginia.

OI’s scope of work:

Cable Installation Analyses have been performed by the OrcaFlex department within DEME Offshore. The project team did not believe the results were correct/adequate and therefore requested Offshore Independents for a second opinion on the results. Offshore Independents performed additional checks to check the viability of the results obtained from the original analyses.

Share this page

Related projects

 
RTA Offshore

Umbilical Load Out Analysis, Moss Norway

See project
 
Boskalis

Business Plan for New Product Line (LNG Market)

See project
 
TotalEnergies

Aramis - FEED engineering services for pipeline landfall and pipeline installation engineering for the Aramis offshore pipeline and its spurline

See project
Back to top