Project description:
Boskalis has requested OI to provide engineering support for the tender Sealine. The project consists in crude oil export facility reconstruction, in Iraq. It includes the load-out, transport and installation of two valve station platforms.
OI’s scope of work:
- Clarifications and qualifications;
- Development of transport strategy;
- Topsides, Bridges and Jacket/substructures
Installation method Statement;
- Rigging Design;
- Elaboration of scope of works for procurement (rigging, installation aids, barges & tugs);
- Elaboration of scope of works for piles fabrication, piles handling, driving and monitoring