Project description:
F2-A Hanze platform is connected via a 4” gas export flexible pipeline with the A6-F3B gas pipeline. Next to this pipeline an umbilical has been installed (piggy bagged to the flexible). The flexible pipeline is > 10 years old and need to be replaced with a new flexible. The umbilical will stay in place and the old flexible pipeline will be abandoned.
Oi’s scope of work:
Provide Installation Engineering support including but not limited to:
- Installation analysis
- Installation procedures.
- Installation drawings.