Seagreen (2021) Scour Protection

Seaway 7

Project description:

Rock dumping around the jackets legs, as scour protection system.

OI’s scope of work:

Seaway 7 has contracted Van Oord for the rock installation around the jackets legs at Seagreen project.

As OI has been closely involved with Seaway 7 in the project, it was also contracted to act as their representative onboard Van Oord Braveness for the rock installation.

OI had to ensure that Braveness carried out the job as per Seaway 7 standards, carry out the planning for Braveness and keep Seaway 7 informed about the development of the field.

Service(s)

Share this page

Related projects

 
Jan de Nul

Greenlink/Formosa 2 (2022) Project Engineering Various Projects

See project
 
Tideway

Hornsea Export Omega joint overboarding Analysis

See project
 
Bluestream

Petrogas Helm Project Engineering/Decommissioning Support

See project
Back to top