PLV upgrade & commissioning Pipeline Installation Engineering

Undisclosed client

Project description:

Commissioning of pipelay vessel to lay 48” rigid pipeline. Project focus is on vessel modifications and subsequent pipeline installation.

OI’s scope of work: Beveling station with fender wall

  • The beveling station is a steel construction installed on main deck of the vessel. The construction protects the crew from environmental conditions during pipe beveling operation.
  • The fender wall is safety construction who protects the crew in case of an accident. OI performed following tasks:
      • Design
      • Workshop documentation
      • Strength and seafastening calculation
      • Production and Installation support & survey
Share this page

Related projects

 
N-Sea

Mobilisation Cable repair vessel

See project
 
SPT

Gennaker OWF -Geotechnical Engineering (2023)

See project
 
Seaway 7

Seagreen OWF Suction Caisson Jacket foundations installation (2022) Geotechnical Engineer (Client Rep. o/b Saipem 7000)

See project
Back to top