Project description:
SPT has requested OI to provide installation and HSE engineering support for the installation of two BOP foundations in China. The foundations are based on a cluster of Suction Pile technologies and installed at 2300m water depth and critical weather conditions.
OI’s scope of work:
- Review project documentation
- Drafting
- Lifting Analysis, including definition of Lifting Arrangement, Specification and Support for Procurement
- Vessel assessment and engagement support
- Seafastening Design, including vessel motion
- HSE Plan
- Task Specific Risk Assessment
- Offshore Installation & Retrieval Procedures – incl. Contingency
- HAZID/HAZOP Meeting in China
- Offshore Crew Briefing