BOP foundations Installation Engineering

SPT Offshore

Project description:

SPT has requested OI to provide installation and HSE engineering support for the installation of two BOP foundations in China. The foundations are based on a cluster of Suction Pile technologies and installed at 2300m water depth and critical weather conditions.

OI’s scope of work:

  • Review project documentation
  • Drafting
  • Lifting Analysis, including definition of Lifting Arrangement, Specification and Support for Procurement
  • Vessel assessment and engagement support
  • Seafastening Design, including vessel motion
  • HSE Plan
  • Task Specific Risk Assessment
  • Offshore Installation & Retrieval Procedures – incl. Contingency
  • HAZID/HAZOP Meeting in China
  • Offshore Crew Briefing
Share this page

Related projects

 
Offshore Independents

Internal Project (2022) Floating Wind Installation Analysis

See project
 
VBMS

Cable Basket and Lift Spreader Design Engineering Support

See project
 
HESI

JOWP - Monopile integrity analysis during lifting/upending operations

See project
Back to top