Project description:
Seaway 7 is T&I contractor of the foundations for Formosa 2 OWF project. The scope consists of T&I of 47 four legged jacket type OWT foundations with associated pin piles in Taiwan.
OI’s scope of work:
Seaway 7 requested OI to support them with the engineering work for designing the Pile Installation Frame (PIF).
The design includes Structural Integrity verification of the PIF in SACS for various conditions:
- Lifting
- Transport
- Operations
- Levelling