Formosa 2 OWF Engineering Support for Pile Installation Frame design

Seaway7

Project description:

Seaway 7 is T&I contractor of the foundations for Formosa 2 OWF project. The scope consists of T&I of 47 four legged jacket type OWT foundations with associated pin piles in Taiwan.

OI’s scope of work:

Seaway 7 requested OI to support them with the engineering work for designing the Pile Installation Frame (PIF).

The design includes Structural Integrity verification of the PIF in SACS for various conditions:

  • Lifting
  • Transport
  • Operations
  • Levelling
Share this page

Related projects

 
VBMS

Cable Basket and Lift Spreader Design Engineering Support

See project
 
SPT

Gennaker OWF -Geotechnical Engineering (2023)

See project
 
Geocean

Umbilical exchange

See project
Back to top