Formosa 2 OWF (2022) Project/Field Engineering for Installation of OWF Foundations

Seaway 7

Project description:

Install the foundations (4x pin piles per location) at the OWF Formosa 2, Taiwan.

OI’s scope of work:

Project/Field Engineer(s) providing engineering support both offshore and on board Heavy Lift Vessel ”Seaway Yudin”, during the installation (via hammering) of the 4x pin piles meant for the subsequent installation of the jackets on which the wind turbine generators are situated.

Share this page

Related projects

 
Seaway7

Audrey AB platform removal Engineering Support

See project
 
Boskalis

Sealine Tender Engineering

See project
 
Undisclosed client

PLV upgrade & commissioning Pipeline Installation Engineering YoYo test

See project
Back to top