Formosa 2 OWF (2022) Project/Field Engineering for Installation of OWF Foundations

Seaway 7

Project description:

Install the foundations (4x pin piles per location) at the OWF Formosa 2, Taiwan.

OI’s scope of work:

Project/Field Engineer(s) providing engineering support both offshore and on board Heavy Lift Vessel ”Seaway Yudin”, during the installation (via hammering) of the 4x pin piles meant for the subsequent installation of the jackets on which the wind turbine generators are situated.

Share this page

Related projects

 
HESI

JOWP - Monopile integrity analysis during lifting/upending operations

See project
 
Boskalis

Hollandse Kust West Beta

See project
 
RTA Offshore

Umbilical Load Out Analysis, Moss Norway

See project
Back to top