Project description:

Install the foundations (4x pin piles per location) at the OWF Formosa 2, Taiwan.

OI’s scope of work:

Project/Field Engineer(s) providing engineering support both offshore and on board Heavy Lift Vessel ”Seaway Yudin”, during the installation (via hammering) of the 4x pin piles meant for the subsequent installation of the jackets on which the wind turbine generators are situated.