Project description:
A subsea power cable will be loaded onto a barge at Nexans production site (Halden, Norway) for temporary storage.

OI’s scope of work:
The scope of this work (technical note) is to estimate the sideways force required in the tower arm to manipulate the umbilical touchdown point in the turntable.
Three static cases are evaluated in which the relative position of the tower with respect to the turntable changes.