Structural Analysis

R2G

Project description:
This project involves the structural modification of the research vessel RWS Asterias to enable the installation of a spud pole, a key element designed to improve the vessel’s stability and operational performance during offshore activities. The modification supports enhanced capabilities for precise subsea operations.

OI’s scope of work:
OI’s scope of work focused on performing structural analysis using ANSYS to evaluate the vessel’s local structure. The purpose of the analysis was to confirm that the vessel could safely support the additional loads from the spud pole installation, meeting all applicable safety requirements.

Share this page

Related projects

 
Strohm

Pathway Extension Loads Analysis (2024)

See project
 
Tideway

Hornsea Export Cable Platform Pull in Analysis

See project
 
Undisclosed client

Pipelay Analysis long

See project
Back to top