Project description:
- Upgrade and commissioning of Pipelay Vessel to lay approx. 100 km of rigid pipeline
 - Subsequent installation engineering for the pipelay scope
 
OI’s scope of work:
- Static and dynamic pipelay analysis
 - Metocean conditions evaluation
 - Fatigue analysis
 - Mooring spread analysis for trials and normal pipelay
 - Crossing mooring analyses and associated Risk Assessments
 - Anchoring design and patterns
 - Abandonment and recovery analyses
 - Pipe lifting analysis and rigging design
 - Stinger structural design and installation
 - Vessel stability assessments