Technical Feasibility of Flettner Rotor Integration on a Jack-Up Vessel

Offshore Independents

Project description:
This MSc thesis investigates the technical feasibility of integrating a Flettner rotor on a jack-up vessel, with its primary focus on the conceptual development and structural integrity of the proposed design. This design aims to improve the overall propulsion of the vessel, contributing to a reduction in terms of fuel consumption and associated CO2 emissions.

OI’s scope of work:

  • Fuel savings of Flettner rotor implementation
    • Aerodynamic behaviour of a Flettner rotor
    • Hydrodynamic resistance a jack-up vessel
    • Rotor deployment strategy
    • Power input rotor
  • Concept design
    • Rotor design criteria
    • Rotor placement
    • Material selection
    • Quantified design selection process based on performance
  • Structural analysis
    • Loading conditions
    • Failure mechanisms
    • Analytical calculations and analysis
    • Numerical calculations (ANSYS Mechanical)
Share this page

Related projects

 
Seaway 7

Formosa 2 OWF (2022) Project/Field Engineering for Installation of OWF Foundations

See project
 
Undisclosed client

Munmu Baran (2022) Floating Wind Turbine Installation Analysis

See project
 
SPT Offshore

Suction Piles for Various Projects

See project
Back to top