ONE-Dyas Cable Installation (2025)

N-Sea

Project description:
N-Sea has been awarded by ONE-Dyas the contract for the installation and commissioning of an Export cable from the Riffgat wind farm to the N05-A gas platform. The project includes the following scope of works:

  • Pre-lay survey
  • Deployment of concrete mattresses at two crossings
  • Installation and commissioning of approx. 10-kilometer of Export cable
  • Installation of rock bags at the Riffgat site
  • Post-lay burial of the cable

OI’s scope of work:

Project Engineering works for the following scope of work:

  • Project documentation
  • Logistics of parts and materials
  • Client and subcontractor contact
  • Guidance and reporting of following activities:
    • Vessel (de)mobilization
    • Cable (off)loading
Share this page

Related projects

 
Boskalis

Alexandroupolis LNG Pipeline System FEED Endorsement & Tender Support

See project
 
Geocean

Umbilical exchange

See project
 
Petrogas

Pipeline Cleaning Projects (2022) Technical Scope Review

See project
Back to top