N-Sea was contracted by Prysmian to execute the following works:

  • Transit of CLV Curo to the port of Brindizi, Italy
  • Vessel mobilization/deck layout adjustments
  • (Spare) cable load-out c/w jointing spares and associated equipment
  • Transit to pre-rigged cable end pick-up location, off the coast of Otranto
  • Pick-up of cable end
  • Cable recovery until cable jointing position is reached
  • Handover of cable to Prysmian for jointing
  • Cable lay along cable route
  • Final landing (use of floaters & support vessels)
  • Vessel demobilization

OI’s scope of work:
Offshore Independents supplied a Senior Project Engineer to support the N-Sea project team at the office in Dordrecht with the preparation of the required documentation prior to the start of the project.

 

Share this page

Related projects

 
Reynard

Engineering Support for the Energy Island Pull-in (2023)

See project
 
Tadek

Hub Recovery Seafastening (2022) Engineering Support

See project
 
R2G

Structural Analysis

See project
Back to top