N-Sea was contracted by Prysmian to execute the following works:
- Transit of CLV Curo to the port of Brindizi, Italy
- Vessel mobilization/deck layout adjustments
- (Spare) cable load-out c/w jointing spares and associated equipment
- Transit to pre-rigged cable end pick-up location, off the coast of Otranto
- Pick-up of cable end
- Cable recovery until cable jointing position is reached
- Handover of cable to Prysmian for jointing
- Cable lay along cable route
- Final landing (use of floaters & support vessels)
- Vessel demobilization
OI’s scope of work:
Offshore Independents supplied a Senior Project Engineer to support the N-Sea project team at the office in Dordrecht with the preparation of the required documentation prior to the start of the project.