Fengmiao OWF Export Cable Analysis (2023)

Tramontana

Project description:

Preliminary export cable installation study for Fengmiao1 Offshore Wind Farm project. The intention of the analysis is to confirm feasibility of the installation prior to a potential contract award on LSMS part.

OI’s scope of work:

Workability of the installation barge (GL2030) is shown with regards to the cable acceptance criteria/limits under the specified environmental conditions for different water depths and bottom tension values.

The technical note includes the following analyses:

  •  1200mm2 220kV export cable normal lay analysis
  •  1200mm2 220kV export cable survival analysis