Project description:
ESD provided advise for a client to build a cable lay spread capable of doing cable lay and repair beyond 2000m water depth.
OI’s scope of work:
Offshore Independents was contracted to advise on the feasibility of the chosen concepts of ESD as well as providing operational and technical input in the design and sizing of the equipment required for performing cable installation and repair at such deep-water depths.