Project description:
Analysis of Treport wind farm cable installation.
OI’s scope of work:
The scope of work for OI contained the analysis of:
- Normal Lay
- Abandonment and Recovery
- Quayside Mooring
- Loadout
Pull in
Project description:
Analysis of Treport wind farm cable installation.
OI’s scope of work:
The scope of work for OI contained the analysis of:
Pull in