Tréport Cable Installation Analysis

DEME Offshore

Project description:

Analysis of Treport wind farm cable installation.

OI’s scope of work:

The scope of work for OI contained the analysis of:

  • Normal Lay
  • Abandonment and Recovery
  • Quayside Mooring
  • Loadout

Pull in

Share this page

Related projects

 
DEME Offshore

Norfolk - Export Cable support

See project
 
N-Sea

Orcaflex support - Chute Suitability Study

See project
 
N-Sea

Drafting support for Subsea Clamp Installation

See project
Back to top