Cable Installation Analysis

DEME

Project description:

  • Analysis of EFGL floating wind farm cable installation.

OI’s scope of work:

The scope of work for OI contained the analysis of:

  • Normal Lay
  • Abandonment and Recovery
  • Quayside Mooring
  • Loadout
  • Pull in
  • Overboarding of pull in components
Share this page

Related projects

 
VBMS

Cable Basket and Lift Spreader Design Engineering Support

See project
 
DEME Offshore

CVOW Analyses check

See project
 
VLST

IJmuiden Ver - Projecten Engineering Support

See project
Back to top