CPS stabilization - Rock bag installation

Boskalis

Project description:
Boskalis was awarded the stabilisation of the Cable Protection System (CPS) installed on the infield cables exiting the monopiles of the Sandbank & Hornsrev 3 (HR3) Offshore Wind Farms.

OI’s scope of work:
Boskalis Subsea Cables subcontracted OI for the following tasks:

  • Site visit for rock bag mock-up/test lift at rock bag manufacturer premises.
  • Office-based engineering support including delivery of rock bags installation procedure / method statement, deck layouts etc. and liaison with the Client (Vattenfall).
  • Offshore Field Engineering support on board the Offshore Support Vessel (OSV) North Sea Giant from late February – late April. Concluded by closeout work.
Share this page

Related projects

 
TotalEnergies

Aramis - FEED engineering services for pipeline landfall and pipeline installation engineering for the Aramis offshore pipeline and its spurline

See project
 
Petrol Ofisi

Antalya Terminal Pipeline Extension Verification of detailed design

See project
 
N-Sea

Arkona Met Mast (2025)

See project
Back to top