POB foundation Installation Installation Engineering

SPT Offshore

Project description:

SPT has requested OI to provide installation and HSE engineering support for multiple projects based in the South China sea and in the Gulf of Mexico. The installations are for the start up pile for pipeline installation, PLEM foundation and for 3 wind turbine Jackets. The installations used surface divers, Sat divers and ROVs to assist depending on the install depth of 27 – 3000 meters.

OI’s scope of work:

  • Review project documentation
  • Seafastening Design review
  • Task Specific Plans and Risk Assessments
  • Offshore Installation & Retrieval Procedures – incl. Contingency
  • HAZID/HAZOP Meeting
  • Offshore Crew Briefing