ICCP BUOY INSTALLATION -Cable Installation Analysis

OEG Subsea

Project description:
TenneT has subcontracted Bluestream for the subsea installation portion for the ICCP retrofit of the SylWin Alpha jacket, located in the German sector of the Southern North Sea / German Bight. The position of the SylWin alpha platform is shown and marked within the red circle as can be seen in the figure.

  • OI’s scope of work:
    Bluestream subcontracted OI for the following tasks:
    Feasibility studies for cable installation
    Providing engineering support for:
    Static cable lay anlaysis
    Dynamic cable lay analysis
    On-bottom stability analysis
Share this page

Related projects

 
Undisclosed client

PLV upgrade & commissioning Pipeline Installation Engineering

See project
 
TotalEnergies

Aramis - FEED engineering services for pipeline landfall and pipeline installation engineering for the Aramis offshore pipeline and its spurline

See project
 
Bluestream

Wells Decommissioning (2022) Project Engineering

See project
Back to top