Rosebank IEPCI (2025)

RTA Offshore

Project description:

The Rosebank iEPCI Project covers the manufacture and installation of subsea production systems, flexible and rigid pipe, and umbilicals, as well as connection to the host facility. Two carousels packed with flexible pipelines and other equipment will be loaded and transported on the deck of a AMT C-Class Crusader

OI’s scope of work:

Analysis and reporting of the barge deck strength under the 2400 mT carousel loading during transportation.