VBMS – OFFPIPE Feasibility Study

VBMS – OFFPIPE Feasibility Study

Project description:

VBMS were tendering on a rigid pipeline installation job. They were planning to use a Modular Pipelay Spread (MPS) on one of their existing vessels.

OI Scope:

Offshore Independents was contracted by VBMS to partake in a feasibility study of a proposed Modular Pipelay Spread (MPS).

OI’s scope was to perform pipeline installation analysis with Offpipe to:

  • Determine if the proposed MPS was suitable and propose modifications to MPOS and stinger.
  • Determine the required parameters for the installation of the rigid pipeline