SPT-F3-FA Topside Removal

SPT - F3-FA Topside removal (2018)

Project

 In March 2015, New Age Cameroon Offshore Petroleum SA became Operator of the Etinde Permit offshore Cameroon. SPT was awarded the engineering study for the removal and of the F3-FA topside and relocation from North Sea to Cameroon.

 

OI scope

 The whole engineering scope consisted of approx. 12 packages:

OI provided engineering support in the management of half of the work packages:

  • progress report,
  • subcontractors management,
  • lead structural engineering tasks.