Golfinho pipeline Installation

Van Oord

Project description:

  • Van Oord (VOO) is pipeline installation contractor of Golfinho project.
  • 45 km of pipelines will connect more than 20 well heads with the onshore LNG in Mozambique.
  • The project is operated by TotalEnergies

OI’s scope of work:

Van Oord requested OI to change the calculation and design of:

  • Wet buckle recovery frame of 6”, 8” and 22”pipeline
  • Abandonment and recovery head of 6”, 8” and 22”pipeline
  • Design of WBRF heads