Project description:
- Van Oord (VOO) is pipeline installation contractor of Golfinho project.
- 45 km of pipelines will connect more than 20 well heads with the onshore LNG in Mozambique.
- The project is operated by TotalEnergies
OI’s scope of work:
Van Oord requested OI to change the calculation and design of:
- Wet buckle recovery frame of 6”, 8” and 22”pipeline
- Abandonment and recovery head of 6”, 8” and 22”pipeline
- Design of WBRF heads