TCP Installation Equipment

Strohm

Project description:
The Field Service Group (FSG) is responsible for all activities taking place outside of the manufacturing plant in Ijmuiden, The Netherlands, and offers client onsite support. One of the assignment for FSG is an onshore TCP flowline installation in harsh environment conditions for which FSG has requested support in preparations for the works.

OI’s scope of work:
Defining required equipment for onsite terminations
Creating Bill of Materials for required equipment and manage the procurement process
Creating of the required procedures for installation of our end fitting and midline connectors

Share this page

Related projects

 
Seaway 7

Formosa 2 OWF (2022) Project/Field Engineering for Installation of OWF Foundations

See project
 
RTA Offshore

Baltyk Cables

See project
 
DEME Offshore

Doggerbank OWF (2022-2023) Inter Array Cable and Export Cable Installation Analysis

See project
Back to top