Project description:
- Cadeler modified the ship Wind Keeper to suit requirements of upcoming wind farm installation project
- OI was requested to develop various drawings and reports
OI’s scope of work:
- Seafastening design of Blade, Tower and Nacelle installation tools
- Gangway outrigger platform
- Container access walkway
- Deck reinforcement
- Seafastening report
- Lifting arrangement of boat landing tool