OI’s scope of work:
Offshore Independents has delivered a fit‑for‑purpose design for our client, Cadeler, for their new vessel Wind Keeper. To optimize deck space, eight office containers needed to be safely double stacked on board.
We engineered a secure sea‑fastening solution that makes use of the vessel’s existing strong points, ensuring stability during offshore operations. An access platform — complete with stairs and walkways — was designed to provide safe and efficient access to all containers for daily use.
The entire structure was optimized for fast fabrication and road transport, enabling quick and cost‑effective mobilization.