Engineering

Bluestream Offshore

Project description:

Offshore Independents has been contracted by Bluestream Offshore to assist with documents and offshore personnel for the replacement of ICCP anodes for windfarms located in German and Danish waters.

OI’s scope of work:

The scope of work for OI contained the following tasks:

  • Procedures
  • Standard documents
  • Deck Layout drawing with options
  • Construction drawings for grillages
  • Support during offshore campaign.