Project description:

In late 90’s a submarine fiber optic telecommunications cable Circe North was laid between Lowestoft in the UK and Zandvoort in the Netherlands. Now, a second fiber optic cable system is planned next to the existing cable. Deme has been contracted to perform cable lay and burial..

OI’s scope of work:

Deme has contracted OI to support with the following work scope:

  • Worksmanager to prepare (procedures @ subcons) and execute (with the assistance of LE) Livingstone mobilization, cable lay & burial