Heerema Marine Contractors– BP Block 31 Riser Installation Study

Heerema Marine Contractors– BP Block 31 Riser Installation Study

Project description:

Heerema Marine Contractors (HMC) will perform a deepwater Riser Installation in Block 31, Angola. The Riser installed is a Single Leg Hybrid Riser (SLHR).

OI Scope:

Offshore Independents performed a deepwater Riser Installation Study by analyzing the possibility of using the DCV Balder for SLHR installation in 3D element analysis program Orcaflex.