Bluestream– Installation Engineering Support for Dana F2-A Hanze 4 inch Gas Export Pipeline

Bluestream– Installation Engineering Support for Dana F2-A Hanze 4 inch Gas Export Pipeline

Project description:

F2-A Hanze platform is connected via a 4” gas export flexible pipeline with the A6-F3B gas pipeline. Next to this pipeline an umbilical has been installed (piggy bagged to the flexible).

The flexible pipeline is > 10 years old and need to be replaced with a new flexible. The umbilical will stay in place and the old flexible pipeline will be abandoned.

OI Scope:

Provide Installation Engineering support including but not limited to:

  • Installation analysis
  • Installation procedures.
  • Installation drawings.